Project Status
Planning submitted
-
Address
Land off Heath Road
Swaffham Prior
East Cambridgeshire
The Project
Low Carbon is bringing forward a new renewable energy project along with the infrastructure needed to export the electricity it generates to the local network operator, UK Power Networks.
The solar farm, will contribute to supporting our transition to a low carbon energy system while securing the energy needs for Great Britain whilst helping to reach our commitment of net zero carbon emissions by 2050.
Long Barrow Solar is proposed for a period of 40 years, after which the modules would be decommissioned and removed from the land and as many items will be recycled or re-purposed as possible.
We have submitted a full planning application to East Cambridgeshire District Council (application reference number: 25/00770/ESF).